Years | Jobs Desc | Values |
2019 | Wellhead WIT/SIT/Adhoc | 40 Strings campaign to carryout WIT/Adhoc ongoing. Secondline will kick-off using information from WIT operations. |
2019 | Gaslift Valves Changeout/Optimisation | Planning for gaslift installation on news well and optimisation of old wells. |
2019 | Sand Management in a client fields | Flow tested 5 gas wells and monitoring sand with Clamp-On Acoustic meter to ensure no sand influx to gas plant. |
2018 | Gaslift Valves Changeout/Optimisation | Changeout (non-functioning/old/obsolete/poorly calibrated) 42 Offloading valves and 10 orifice from 10 wells to new valves and did 4-rates test and gain +1200bopd for client. |
2018 | Gaslift Valves Changeout | Installed orifice valves in two new wells and kicked-off on gaslift. Each string delivering over 1000bopd. |
2018 | Wellhead WIT/SIT/Firstline | 35 Strings campaign to carryout firstline and testing of all flow Wetted areas of wellhead with well pressure or pressure pump and mark out materials for repairs. |
2018 | Wellhead WIT/SIT/Firstline | Sub-surface wellhead accessories testing done on five gas wells and six high GOR wells. 20 Strings campaign to repairs/replace/re-set wellhead accessories. |
2017 | Gaslift Valves Change out and optimization | Well making over 1000bopd. Gain plus 400bopd from gas optimisation. |
2017 | Sand Management in a client fields | Gain +300bopd via choke optimisation, safe pumps life |
2016 | Condensate/crude/water evacuation | Evacuated plus 50000bbls to crude to refinery |
2016 | Sand Management in a client fields | Gain +1000bopd via choke optimisation |
2016 | Wellhead Firstline | 25 Strings campaign to carryout Firstline and mark out materials for repairs |
2016 | Wellhead Secondline | 12 Strings campaign to carryout repairs and replacement of malfunctioning valves and damage wellhead accessories |
2015 | Gaslift Optimisation in a client field | Gain plus 800bopd via optimum gas injection |
2015 | Oil and Gas wells acid stimulation chemicals – in client wells | New well meet expected potentials- well-30/29 etc |
2015 | Gas well acid stimulation in client wells | Expected gains |
2015 | Crude/Condensate Trucking | Crude trucking for marginal field producers |
2015 | Manpower supply | ESP/Gaslift Engineer |
2014 | Wellhead Firstline | 21 Strings campaign to carryout Firstline and mark out materials for repairs |
2014 | Wellhead SecondLine | 15 Strings campaign to carryout repairs – AVA changeout, Swab valve changeout, O ring replacements, Pilot-resetting etc |