2019

Wellhead WIT/SIT/Adhoc

40 Strings campaign to carryout WIT/Adhoc ongoing. Secondline will kick-off using information from WIT operations.

2019

Gaslift Valves Changeout/Optimisation

Planning for gaslift installation on news well and optimisation of old wells.

2019

Sand Management in a client fields

Flow tested 5 gas wells and monitoring sand with Clamp-On Acoustic meter to ensure no sand influx to gas plant.

2018

Gaslift Valves Changeout/Optimisation

Changeout (non-functioning/old/obsolete/poorly calibrated) 42 Offloading valves and 10 orifice from 10 wells to new valves and did 4-rates test and gain +1200bopd for client.

2018

Gaslift Valves Changeout

Installed orifice valves in two new wells and kicked-off on gaslift. Each string delivering over 1000bopd.

2018

Wellhead WIT/SIT/Firstline

35 Strings campaign to carryout firstline and testing of all flow Wetted areas of wellhead with well pressure or pressure pump and mark out materials for repairs.

2018

Wellhead WIT/SIT/Firstline

Sub-surface wellhead accessories testing done on five gas wells and six high GOR wells. 20  Strings campaign to repairs/replace/re-set wellhead accessories.

2017

Gaslift Valves Change out and optimization

Well making over 1000bopd. Gain plus 400bopd from gas optimisation.

2017

Sand Management in a client fields

Gain +300bopd via choke optimisation, safe pumps life

2016

Condensate/crude/water evacuation

Evacuated plus 50000bbls to crude to refinery

2016

Sand Management in a client fields

Gain +1000bopd via choke optimisation

2016

Wellhead Firstline

25 Strings campaign to carryout Firstline and mark out materials for repairs

2016

Wellhead Secondline

12 Strings campaign to carryout repairs and replacement of malfunctioning valves and damage wellhead accessories

2015

Gaslift Optimisation in a client field

Gain plus 800bopd via optimum gas injection

2015

Oil and Gas wells acid stimulation chemicals – in client wells

New well meet expected potentials- well-30/29 etc

2015

Gas well acid stimulation in client wells

Expected gains

2015

Crude/Condensate Trucking

Crude trucking for marginal field producers

2015

Manpower supply

ESP/Gaslift Engineer

2014

Wellhead Firstline

21 Strings campaign to carryout Firstline and mark out materials for repairs

2014

Wellhead SecondLine

15 Strings campaign to carryout repairs – AVA changeout, Swab valve changeout, O ring replacements, Pilot-resetting etc